Blog

What Strata Property Managers Should Know About Paint Warranties and Compliance

One defective paint job across 50 apartments costs $150,000+ to rectify. Most strata managers don’t realise their contractor’s “warranty” is worthless until years later, when the entire building needs repainting.

The difference between a proper warranty and legal compliance could save, or cost, your owners’ corporation a fortune.

Strata property managers in Australia must navigate paint warranties, AS/NZS 2311:2017 compliance standards, and defects liability periods while protecting owners’ corporation budgets. Understanding the critical differences between paint product warranties, workmanship guarantees, and statutory defects obligations prevents costly disputes and premature failures across common property areas.

Here’s what we’re going discuss:

  • Product vs workmanship warranty differences matter legally
  • AS/NZS 2311:2017 compliance isn’t optional. It’s mandatory
  • 5-7 year workmanship warranties separate quality contractors
  • Defect liability periods vary by state and building age
  • Documentation requirements protect owners’ corporations

 

The Critical Difference Between Paint Warranties and Workmanship Warranties

Paint warranty covers the product itself. Manufacturing defects, premature fading, or formula failures.

Workmanship warranty covers labour, surface preparation, application technique, and adhesion failures.

Most strata managers confuse these completely. They’re separate protections covering different failure types.

Paint manufacturers typically offer 10-15-year product warranties. They guarantee the paint performs as specified when applied correctly.

But here’s the catch. Product warranties require proper application. Poor prep work or incorrect technique voids manufacturer coverage instantly.

Workmanship warranties protect against application failures regardless of product quality. Peeling from contaminated surfaces. Flaking from inadequate prep. Uneven coverage from a rushed application.

Quality contractors provide 5-7 year workmanship warranties minimum. Budget operators offer 12 months or none at all.

That difference matters enormously when failures appear 3-4 years later.

 

Australian Standard AS/NZS 2311:2017: What Compliance Actually Means

AS/NZS 2311:2017 is the national guide for painting buildings, specifying preparation, application, and quality standards.

This standard isn’t optional. It’s the baseline for professional commercial painting in Australia.

Licensed painters must follow these specifications covering:

  • Surface preparation requirements for different substrates
  • Primer selection and application methods are properly
  • Paint system compatibility and coating thickness
  • Quality control and inspection protocols
  • Safety requirements and access considerations

Contractors claiming compliance should demonstrate knowledge of specific sections. Ask them to explain the preparation requirements for your substrate type.

Vague answers reveal contractors are actually unfamiliar with the standard, actually. They’re relying on residential experience inappropriately.

Non-compliant work fails faster and costs more to rectify. Insurance claims get rejected. Warranties become unenforceable.

Compliance protects your owners’ corporation legally and financially.

 

Understanding Defects Liability Periods for Strata Painting Projects

Defects liability period is the timeframe during which builders or contractors must rectify defects at no cost.

These periods vary significantly by state, building age, and contract type.

 

Situation Defects Liability Period
New builds (NSW) – minor defects 2 years from the completion certificate
New builds (NSW) – major structural 6 years from the completion certificate
Strata maintenance contracts Negotiated 1-7 years typically
Builder’s statutory warranty Varies by state legislation
Contractor workmanship warranty 5-7 years for quality operators

 

New builds include painting under the builder’s statutory warranty initially. When that expires, the owners’ corporations assume responsibility completely.

Maintenance repaints require separate contractor warranties covering workmanship specifically.

Confusion between statutory defects liability and maintenance warranties causes disputes constantly. They’re different obligations with different coverage.

Document which warranty applies to each painting phase clearly.

 

Why the Cheapest Quote Almost Always Costs More Long-Term

Budget contractors win strata tenders by cutting corners invisibly.

They use:

  • Minimum surface preparation saving 40% of labour
  • Cheaper paint grades failing within 3-5 years
  • Two coats instead of three reduces coverage
  • Untrained painters producing inconsistent results
  • No warranty backing when failures appear

A $50,000 cheap quote failing after 4 years costs $65,000+ to strip and repaint properly.

A $70,000 quality quote with a 7-year warranty lasting 12+ years costs $5,800 annually.

Quality contractors provide comprehensive protection:

  • Detailed surface preparation specifications
  • Premium paint systems with manufacturer backing
  • Licensed, insured, experienced applicators
  • 5-7 year workmanship warranties minimum
  • Ongoing maintenance, support, and documentation

The $20,000 upfront saving becomes $40,000+ in premature replacement costs.

Prioritise warranty length and contractor reputation over the lowest price always.

 

Essential Documentation Requirements for Owners’ Corporation Protection

Paint specifications are detailed records of products, colours, application methods, and maintenance requirements used.

Strata managers must maintain comprehensive documentation protecting owners’ corporation interests.

Required records include:

  • Complete paint specifications with product codes
  • Colour formulas for exact matching future touch-ups
  • Surface preparation methods used on each substrate
  • Number of coats applied to different areas
  • Warranty certificates from the contractor and manufacturer
  • Meeting minutes approving colour scheme changes
  • Contractor licenses, insurance certificates, and WHS documentation
  • Progress photos documenting preparation and application stages

These records prove compliance when disputes arise. They enable accurate quoting for future maintenance. They protect against warranty claim rejections.

Lost documentation voids warranties commonly. Manufacturers reject claims without proof of proper application.

Store records digitally with multiple backups. Include them in AGM reports annually.

 

WHS Compliance for High-Rise and High-Traffic Strata Painting Projects

Work Health and Safety (WHS) compliance means meeting legal obligations to protect workers and the public during construction activities.

High-rise strata painting involves serious safety risks requiring detailed planning.

Contractors must provide comprehensive WHS documentation, including:

  • Site-specific safety management plans
  • High-risk work licenses for abseiling or EWP operation
  • Traffic management plans for ground-level disruption
  • Public liability insurance covering strata common areas
  • Emergency response procedures and first aid provisions
  • Resident notification protocols for access and disruption

Abseiling is a rope access method where painters descend building exteriors using specialised equipment and training.

Elevated work platforms (EWP) are mechanical lifts providing stable working platforms for height access safely.

Different access methods suit different building types. Abseiling works for buildings over 10 storeys. EWPs suit mid-rise developments. Scaffolding fits low-rise complexes.

Strata managers’ liability increases if contractors work unsafely. Request WHS documentation during the tender evaluation process.

Reject quotes lacking detailed safety planning, regardless of price.

 

Common Property Maintenance: Preventing Warranty Voiding Through Neglect

Common property includes all areas owned collectively by the owners’ corporation. Exterior walls, foyers, corridors, facilities.

The owners’ corporation holds responsibility for maintaining these areas properly.

Neglected maintenance voids paint warranties quickly:

  • Blocked gutters causing water damage, void coverage
  • Unreported leaks penetrating painted surfaces
  • Deferred repairs allow substrate deterioration
  • Vegetation growth is damaging the rendered walls
  • Pressure washing, removing protective coatings

Paint manufacturers specify maintenance requirements explicitly. Failure to follow them nullifies product warranties completely.

Workmanship warranties typically require:

  • Annual inspections identify minor issues early
  • Prompt repairs prevent small problems from escalating
  • Proper cleaning using approved methods only
  • Touch-up painting matching original specifications
  • Documentation proving maintenance compliance

Establish annual inspection schedules with qualified painters. Budget for minor touch-ups to prevent major failures.

Preventative maintenance costs 10% of reactive emergency repairs.

 

Strata Manager Procurement Responsibilities for Painting Projects

Procurement is the process of obtaining quotes, evaluating contractors, and awarding painting contracts properly.

NSW strata legislation requires a minimum of two independent quotes for substantial projects.

Projects exceeding $30,000 (or lower thresholds in some schemes) need general meeting approval specifically.

Proper procurement protects strata managers from accusations of favouritism or negligence.

Best practice procurement includes:

  • Detailed scope specifications ensuring comparable quotes
  • Minimum three quotes from licensed, insured contractors
  • Reference checks with previous strata clients
  • Warranty comparison across all tenderers
  • Insurance certificate verification before contract award
  • Committee or general meeting approval documented

Cheapest quote doesn’t automatically win. Strata managers can recommend higher-priced contractors with superior warranties justifiably.

Document your recommendation rationale clearly. Include warranty terms, contractor experience, and reference feedback.

This protects against owner complaints about not choosing the lowest price.

 

Colour Scheme Changes: Approval Processes and Compliance Requirements

Colour scheme changes to common property require owners’ corporation approval through general meeting resolutions.

Strata managers cannot approve significant colour changes independently.

The approval process involves:

  • Professional colour consultation and sample boards
  • Presentation at the committee meeting for recommendation
  • Motion prepared for general meeting approval
  • Ordinary or special resolution, depending on the scheme bylaws
  • Documentation of approved colours with specific codes
  • Notification to all owners before work commences

Some schemes require special resolutions for dramatic changes. Others allow ordinary resolutions for maintenance repaints in similar colours.

Check your scheme bylaws before recommending colour changes.

Painters changing colours without proper approval create legal liabilities. Owners can demand repainting of the original schemes.

Document approvals meticulously. Include colour codes in meeting minutes permanently.

 

What Are the Obligations of a Strata Manager in NSW?

Strata managers are paid professionals coordinating owners’ corporation compliance, administration, and property maintenance.

Their painting-related obligations include:

  • Coordinating AGMs and committee meetings for approval processes
  • Preparing maintenance budgets, including painting reserves
  • Obtaining multiple quotes from qualified contractors
  • Issuing levies to owners for funding approved projects
  • Paying contractor invoices from the owners’ corporation accounts
  • Managing insurance claims for painting-related damage
  • Maintaining records of warranties and specifications
  • Ensuring contractor compliance with WHS and standards

Strata managers aren’t personally liable for contractor defects. But they’re responsible for proper procurement processes and documentation.

Negligent procurement or inadequate contractor vetting exposes managers to owners’ corporation claims.

Follow proper processes, protecting both the owners’ corporation and your professional reputation.

 

 

Why Professional Commercial Painters Understand Strata Requirements Better

Residential painters struggle with strata complexity constantly.

They don’t understand:

  • Multi-owner approval requirements
  • AS/NZS 2311:2017 compliance obligations
  • Extended warranty expectations
  • WHS documentation for high-rise access
  • Strata procurement protocols

Commercial contractors experienced with strata work differently.

They provide detailed documentation automatically. Structure quotes meeting procurement requirements. Understand approval processes. Offer appropriate warranty terms.

They coordinate with strata managers professionally rather than treating projects like residential jobs.

The experience difference prevents disputes, delays, and compliance failures.

Luxury Design Painting specialises in strata projects where compliance, documentation, and robust warranties protect owners’ corporations. Get expert guidance navigating procurement, approval, and contractor selection processes professionally.

 

Conclusion

Paint warranties and compliance standards exist to protect owners’ corporations from costly, premature failures. Understanding the difference between product warranties, workmanship guarantees, and statutory defects liability prevents budget blowouts and legal disputes down the track.

Quality contractors with 5-7 year workmanship warranties, AS/NZS 2311:2017 compliance knowledge, and comprehensive WHS documentation cost more upfront but deliver dramatically better long-term value. The cheapest quote almost always becomes the most expensive option when failures appear years later.

Don’t risk yourowners’s corporation’s investment on inadequate warranties or non-compliant work. Contact Luxury Design Painting for strata-specific quotes backed by comprehensive warranties, proper compliance documentation, and 20+ years of commercial painting expertise across Sydney.

Call Us